Building a data centre from scratch isn’t easy. This video shows the construction of Telstra’s new data centre in Clayton, Melbourne over a period of months.
Built over two years, the site had two dedicated “data halls”, each 1000 metres squared in size. The site can handle a loaf of more than six megawatts.
The centre will be used to host VMware’s vCloud Air and Cisco’s InterCloud, as well as Telstra’s own branded cloud services.
[via Telstra Exchange]
Leave a Reply
You must be logged in to post a comment.